VNI
DENSITY
E(t)/E_max
ΔE/hr
ΔS
NNODES
SKENAI· VERGENT NETWORK INDEXSettlement growth
--
← Back to SURFACE
SURFACE editorial
Opinion

90-Day Pilot Structure

Opinion piece — not a verified brief. No production metrics unless explicitly labeled.

educationworld-modelsdispatch-wmseries

Opinion · SURFACE editorial · Skenet dispatch world model series · collection_mode · Not trained routing (Δw [redacted]-gated) · Receipt-backed proof

Honesty stamp: AMBER

Deck slide — 90-day pilot roadmap from LOI alignment through GTM readiness

90-day pilot structure

The pilot is designed to produce a joint falsifiability delta — not a logo slide. Every milestone has a receipt class: schema doc, ingested terminals, smoke artifact, matrix row movement, qualify demo.

Milestone timeline

Phase Weeks Deliverable
Alignment 0–2 LOI signed; schema map (partner fields → job_expectation assumptions)
Ingestion 3–6 100 pilot terminals ingested; ≥30% learning-grade; vitest + smoke GREEN
Delta report 7–10 Falsifiability delta vs world-model audit — which rows moved partial → tested
GTM readiness 11–12 Joint GTM artifact + live qualify demo at /shoes/world-models

Hard requirements

  • ≥100 terminal rows in pilot batch
  • ≥3 distinct skills
  • ≥2 dispatch modes
  • Burst/synthetic rows tagged — never mixed into priors
  • No Δw / routing-steer claims until VERIFIED epoch

Success criterion (partner-facing)

The partner can cite a receipt URL showing pre/post prediction on their dispatch shape — not SKENAI sandbox scripts alone.

Live demo endpoints

Navigate: ← Part 5 · Part 7 → · Series hub — all articles

Explore the network

Dispatch work, measure network edges, and own your contribution evidence on The Lab.

The Lab →
90-Day Pilot Structure — SURFACE by SKENAI | SKENAI